An SBA Certified 8(a), WBE, SBE, DBE Company
Contractors License #827022


Soil Vapor Extraction Feasibility Testing Equipment Fabrication - Pipeline Terminal

Services Provided Oversight Agency Project Details
  • Equipment Fabrication
  • Soil vapor extraction
  • Feasibility testing
  • Remediation reporting
  • O&M services
  • ADEQ
  • Start Date: 1/03
    End Date: Ongoing
    Total Contract: $800,000

    PROJECT HIGHLIGHTS
    • Three 500 scfm thermal oxidizers
    • SVE feasibility testing
    • Northstar 500 scfm portable oxidizer
    • Weekly O&M and equipment optimization
    • Detailed remediation reporting
    • System modifications
    • Annual maintenance inspections
    • Coordination with terminal operations
    Project scope included the delivery, installation, startup and ongoing operations and maintenance (O&M) of three 500 standard cubic feet per minute (scfm) capacity soil vapor extraction (SVE) thermal oxidizers. The SVE units currently treat petroleum hydrocarbon impacted soils at the site in three separate locations. The O&M activities include but are not limited to weekly collection of treatment system data including operating temperature, system flow rate, inlet and outlet hydrocarbon concentrations, and supplemental fuel consumption. Individual well hydrocarbon concentrations are collected once per month. Adjustments to the well field are made as required in order to maximize the extracted hydrocarbon rates. Northstar staff collected monthly laboratory samples to verify compliance with operating permits.

    System modifications included installation of radio frequency transmitters for remote shut-down of systems by terminal operating personnel in the event of any alarm condition at the terminal.

    Northstar has provided services at this terminal for approximately 5 years, has been an urgent responder to new releases with portable remediation equipment, and has provided multiple events of feasibility testing to assess conditions for a permanent system.